Test Facilities Available for use by Private Sector
Guidelines for Use of Test Facility
1. Test facility
The list of test facilities which can be made available to private firms for testing of materials /sub-systems / equipment are as per the list at Annexure 'A'.
2. Registration of private firms for use of test facilities
A private firm already registered in concerned Naval Unit can directly avail the test facilities as per the procedure given below. Any private firm not already registered will need to submit the following documents:
- Company Profile
- Income Tax returns for last 3 years
- Audited balance sheet / P&L Statement for last 3 years
- PAN / TIN
- The verification will be carried out by the concerned Naval Unit where the Test Facility is available.
3. Procedure to avail the test facilities by a private firm
- A registered private firm shall submit the end use certificate, Non disclosure declaration form along with the Test facility request.
- The items / sub systems meant for Defence applications will only be tested.
- The Nodal agency in respective Naval unit will study the technical specs of the test to be carried out.
- The slot availability along with quote will be communicated to private firm in case the available test facilities are capable of meeting the technical requirements.
- The private firm shall place a Service Order including acceptance of payment terms as per the quote and handover the job at the respective Naval unit Premises to carry out the test(s).
- The test(s) will be carried out as per standard procedures by respective Naval unit only.
- The test reports along with the job will be handed over to the private firm.
4. General terms & conditions
- The test services to private firms will be made available, only in case of spare capacity, over and above meeting the internal needs.
- All transportation of job (including loading / unloading) from / to Naval Unit’s testing premises is the responsibility of the private firm.
- Personnel from private firms to produce proof of Identity / authorisation letter.
- Inspection of the job will be done by security staff before moving the job to / from Naval premises.
- The testing charges are fixed at nominal rates taking into account all direct & setup costs Annexure 'A'.
- The Rate indicated in the list, are for budgetary purpose only. The rates may vary and the actual rates will be indicated in the quote, furnished by the respective units.
- The test charges are applicable for standard test procedures. In case of any additional tests, charges will be suitably modified depending on the job specifications.
- Applicable charges are exclusive of VAT / Service / other taxes.
- For cancellation of allotted slot, 25% of the testing charges will be forfeited.
- Navy will not be responsible for loss / damage to the equipment / instrument while carrying out the test(s).
- If any damage occurs to equipment / property / personnel resulting from the testing of the job of private firm, the private firm should bear the expenses in repair / replacement of the facility. All necessary insurance coverage for the job shall be the responsibility of the private firm.
Annexure ‘A’
TEST FACILITES AVAILABLE FOR USE BY PRIVATE SECTOR
(A) UNIT - NAVAL AERONAUTICAL QUALITY ASSURANCE SERVICE
CONTACT DETAILS
CONTACT DETAILS - CONTROLLER QUALITY ASSURANCE (FACILITY)
ADDRESS - NAQAS
NAVAL BASE
KOCHI -682004
TEL - 0484-2873658, 0484 -2873652
EMAIL - naqas@navy.gov.in
CALIBRATION FACILITY -ELECTRO TECHNICAL CALIBRATION FACILITY
SL |
CALIBRATION FACILITY AND RANGE |
APPROX COST (INR) (PER SAMPLE) |
ADVANCE NOTICE |
PERIOD FOR AVL OF TEST FACILITY |
DURATION TEST (PER SAMPE) |
---|---|---|---|---|---|
SOURCE | |||||
1 |
DC Voltage (100mV - 1000V) |
Rs. 14375.00 |
15 DAYS |
ALL WORKING DAYS |
15 DAYS |
2 | DC CURRENT (1mA - 10A) |
Rs. 14375.00 |
15 DAYS |
ALL WORKING DAYS |
15 DAYS |
3 |
AC VOLTAGE 50Hz to 400Hz (100mV - 1000 V) |
Rs. 14375.00 | 15 DAYS | ALL WORKING DAYS | 15 DAYS |
4 |
AC CURRENT 50 Hz(1mA - 10 A) |
Rs. 14375.00 | 15 DAYS | ALL WORKING DAYS | 15 DAYS |
5 |
DC RESISTANCE 2 WIRE (10Ω - 100MΩ) |
Rs. 14375.00 | 15 DAYS | ALL WORKING DAYS | 15 DAYS |
6 |
FREQUENCY (1K Hz – 1MHz) |
Rs. 15333.00 |
15 DAYS | ALL WORKING DAYS | 20 DAYS |
7 |
FREQUENCY (1 MHz - 20 GHz) |
Rs. 15333.00 | 15 DAYS | ALL WORKING DAYS | 20 DAYS |
8 |
FREQUENCY (20 GHz - 40 GHz) |
Rs. 15333.00 | 15 DAYS | ALL WORKING DAYS | 20 DAYS |
MEASURE | |||||
9 |
DC Voltage (100mV - 1000V) |
Rs. 14375.00 | 15 DAYS | ALL WORKING DAYS | 15 DAYS |
10 |
DC CURRENT (1mA - 10A) |
Rs. 14375.00 | 15 DAYS | ALL WORKING DAYS | 15 DAYS |
11 |
AC VOLTAGE 50Hz to 400Hz (100mV - 1000 V) |
Rs. 14375.00 | 15 DAYS | ALL WORKING DAYS | 15 DAYS |
12 |
AC VOLTAGE 10KHz (10V - 1000 V) |
Rs. 14375.00 | 15 DAYS | ALL WORKING DAYS | 15 DAYS |
13 |
AC CURRENT 50 Hz(1mA - 10 A) |
Rs. 14375.00 | 15 DAYS | ALL WORKING DAYS | 15 DAYS |
14 |
DC RESISTANCE 4 WIRE(1Ω) |
Rs. 1550.00 |
15 DAYS | ALL WORKING DAYS | 15 DAYS |
15 |
DC RESISTANCE 2 WIRE (10Ω - 100MΩ) |
Rs. 12825.00 |
15 DAYS | ALL WORKING DAYS | 15 DAYS |
16 |
FREQUENCY (1K Hz – 1MHz) |
Rs. 32200.00 |
15 DAYS | ALL WORKING DAYS | 20 DAYS |
17 |
FREQUENCY (1 MHz - 20 GHz) |
Rs. 32200.00 |
15 DAYS | ALL WORKING DAYS | 20 DAYS |
18 |
FREQUENCY (20 GHz - 40 GHz) |
Rs. 32200.00 | 15 DAYS | ALL WORKING DAYS | 20 DAYS |
(A) COST QUOTED ABOVE IS INCLUDING PREVAILING TAX @15%TAX (SUBJECT TO CHANGE) AS ON 30 MAY 17.
(B) WITHIN SPECIFIED RANGE 5 POINTS OF MEASURMENT WILL BE UNDERTAKEN AND Rs 500.00 WILL BE CHARGED EXTRA FOR ADDITIONAL POINT OF MEASURMENT.
(C) ALL THE SCOPE SL 1-18 ARE ACCREDITED BY NABL.
MECHANICAL TESTING AND CALIBRATION FACILITY
SL | CALIBRATION FACILITY AND RANGE |
APPROX COST (INR) (PER SAMPLE) |
ADVANCE NOTICE |
PERIOD FOR AVL OF TEST FACILITY |
TEST DURATION (PER SAMPE) |
---|---|---|---|---|---|
TORQUE WRENCH / METER CALIBRATION |
|||||
1 |
TORQUE WRENCH 10 – 100 NM |
RS 2050/- ( ONE DIRECTION) |
07 DAYS |
ALL WORKING DAYS |
7 DAYS |
2 |
TORQUE WRENCH 70 – 350 NM |
RS 2650/- (ONE DIRECTION) |
07 DAYS |
ALL WORKING DAYS |
7 DAYS |
3 |
TORQUE WRENCH 169 – 779 NM |
RS 5750/- (ONE DIRECTION) |
07 DAYS |
ALL WORKING DAYS |
7 DAYS |
NOTE:-
(A) COST QUOTED ABOVE IS INCLUDING PREVAILING TAX @15%TAX (SUBJECT TO CHANGE) AS ON 30 MAY 17.
(B) WITHIN SPECIFIED RANGE 5 POINTS OF MEASURMENT WILL BE UNDERTAKEN AND Rs 500.00 WILL BE CHARGED EXTRA FOR ADDITIONAL POINT OF MEASURMENT.
(C) ABOVE SCOPE IS ACCREDITED BY NABL.
PETROLEUM TESTING AND ANALYSIS LABORATORY
SL |
NAME OF PRODUCT |
DETAILS OF TEST |
NAME OF EQUIPMENT |
TEST METHOD | UNIT |
RANGE |
APPROX COST (INR) (PER SAMPLE) |
PERIOD FOR AVL OF TEST FACILITY |
TEST DURATION (PER SAMPLE) |
---|---|---|---|---|---|---|---|---|---|
01 | OIL |
KINEMATIC VISCOSITY |
VISCOMETER BATH |
IP 71 |
CST |
AMBIENT TO 100°C |
Rs.1400.00 |
ALL WORKING DAYS |
2 DAYS |
02 |
FLASH POINT |
PENSKY MARTIN FLASH POINT APPARATUS |
IP34 | ˚C | 60 ˚C TO 350˚C |
Rs.1100.00 |
2 DAYS |
||
03 | ACIDITY |
MANUALLY BY USING CHEMICALS AND GLASS WARES |
IP1 |
MGKOH/GM |
- |
Rs.900.00 |
3 DAYS |
||
04 |
PARTICLE COUNT |
PORTABLE PARTICLE COUNTER LCM 20 |
IP577 |
NAS 1638 CLASS |
NAS CLASS 1 TO 12 (2µM-100µM) |
Rs.3200.00 |
2 DAYS |
||
05 | DENSITY | HYDROMETER | IP 160 |
KG/M³ |
- |
Rs.1000.00 |
2 DAYS |
||
06 | GREASE | PENETRATION | PENETROMETER | IP50 | - |
0 TO 400 |
Rs.1000.00 |
ALL WORKING DAYS |
2 DAYS |
07 | FUEL | FLASH POINT |
ABEL FLASH POINT APPARATUS |
IP 170 |
˚C |
AMBIENT TO 70 °C |
Rs.1000.00 |
2 DAYS |
|
08 |
DISTILLATION CHARACTERISTICS |
DISTILLATION APPARATUS. |
IP 123 |
˚C |
30°C TO 350 °C AND 5 TO 100 ML |
Rs.1600.00 |
3 DAYS |
||
09 |
GUM CONTENT |
EXISTENT GUM BATH |
IP 131 |
MG /100ML |
1 MG TO 20 MG |
Rs.2200.00 |
2 DAYS |
||
10 |
DENSITY |
HYDROMETER |
IP 160 |
KG/M³ |
- |
Rs.1000.00 |
2 DAYS |
||
11 |
COPPER STRIP CORROSION |
COPPER STRIP CORROSION APPARATUS |
IP 154 | - | 1A TO 4C |
Rs.1400.00 |
2 DAYS |
||
12 |
MICRO BIOLOGICAL CONTAMINATION CHECK |
INCUBATOR ELECTRICAL |
IP 385 |
COLONY/ 1000ML |
COLONIES /1000 ML |
Rs.3600.00 |
ALL WORKING DAYS |
6 DAYS |
|
13 |
MECHANICAL IMPURITIES |
FILTERING APPARATUS |
IP 423 |
(MG / LTR) |
1 MG TO 10 MG |
Rs.1200.00 |
2 DAYS |
||
14 |
WATER CONTAMINATION |
QUALITATIVE METHOD USING AQUA INDICA CAPSULE |
QUALITATIVE |
- |
PASS/ FAIL |
Rs.1400.00 |
2 DAYS |
||
15 |
*WATER REACTION :- (I) INTERFACE RATING (II) SEPARATION |
MANUALLY WITH GLASS WARES |
IP 289 |
- |
1 TO 4
|
Rs.1500.00 |
2 DAYS |
NOTE:-
-
SCOPES AT SL 3,6 AND 12 ARE NOT ACCREDITED BY NABL .
-
TEST EQUIPMENT AND METHODS USED THERIN ARE TRACEABLE TO NATIONAL/ INTERNATIONAL STANDARDS.
-
COST QUOTED ABOVE IS EXCLUDING PREVAILING TAX @15%TAX (SUBJECT TO CHANGE) AS ON 29MAY 17.
-
MBT AT SL NO 12 REQUIRES AT LEAST 105 HR FOR TEST / RESULT COMPILATION.
(B) Naval Dockyard, Visakhapatnam
Contact Details:-
Nodal Contact Officer : AGM(QA) / Manager (Lab)
Address : Naval Dockyard, Visakhapatnam, Andhra Pradesh – 530014
Tele No. : 0891- 2704738, 2816702
E Mail : encasdmit-navy@nic.in
Sl No. | Test Facility | Approx. Cost(Rs) Per Test |
Advance Notice |
Period for Availability of Test Facility/ Year |
Duration of Each Test |
---|---|---|---|---|---|
1 | Material composition analysis of Ferrous metals and alloys. | 500/- | 01 Week | All Working Days | 02 Hours for first sample and 15 minutes thereafter for each sample |
2 | Material composition analysis of Non-Ferrous metals and alloys | 500/- | 01 Week | All Working Days | 02 Hours for first sample and 15 minutes thereafter for each sample |
3 | Non Destructive Testing | 300/- | 01 Week | All Working Days | Varies from Job to Job |
4 | Advanced Lub Oil Testing (Wear Elemental Analysis) | 1200/- | 01 Week | All Working Days | 04 Hours for first sample and 15 minutes thereafter for each sample |
5 | Mechanical Testing of Materials (Tensile, Shear, Spring and Hardness Test) | 300/- | 01 Week | All Working Days | 01 Hour for each sample prepared as per standard |
6 | Static Load Deflection/ Compression testing of Shock and Vibration Mounts/ Dampers | 1100/- | 01 Week | All Working Days | 02 Hours for first sample and 15 minutes thereafter for each sample/ Varies from Job to Job |
(C) Controllerate of Naval Armament Inspection (East), Visakhapatnam
Contact Details:-
Nodal Contact Officer : Quality Manager/ Officer-in-Charge (Lab)
(Including obtaining details of mode of payment)
Address : Controllerate of Naval Armament Inspection (East)
NAD Post
Visakhapatnam - 530009
Tele No : 0891 – 2818943 (Quality Manager)
0891 – 2818947 (OiC Calibration Lab)
0891 – 2818903 (OiC Test Lab)
E Mail : enccnaiv@navy.gov.in
Ser | Test Facility (Type of Tests) |
Approx Cost (INR) (per sample) |
Advance Notice | Period for Availability of Test Facility/ Year | Duration of Test (per sample) |
---|---|---|---|---|---|
1 | Rubber Test Facility | ||||
Material Identification | 200/- | 1 week | All working days | 10 days (for all tests) | |
Tensile Strength | 1000/- | 1 week | All working days | ||
% Elongation | 700/- | 1 week | All working days | ||
Hardness | 350/- | 1 week | All working days | ||
Compression Set % | 2400/- | 1 week | All working days | ||
Swelling | 2400/- | 1 week | All working days | ||
Ageing | 350/- | 1 week | All working days | ||
Apparent Density | 350/- | 1 week | All working days | ||
Adhesion | 2400/- | 1 week | All working days | ||
2 | Ammunition Protective Composition (APC) | ||||
Drying Time | 350/- | 1 week | All working days | 03 days (for all tests) | |
Adhesion | 700/- | 1 week | All working days | ||
Finish & Flexibility | 200/- | 1 week | All working days | ||
Dynamic Viscosity | 350/- | 1 week | All working days | ||
Resistance to Boiling Water & Alkali | 2900/- | 1 week | All working days | ||
Volatile & Non Volatile Matter % | 700/- | 1 week | All working days | ||
Ash % | 700/- | 1 week | All working days | ||
Corrosion Test | 350/- | 1 week | All working days | ||
Gelation Time | 350/- | 1 week | All working days | ||
3 | Paints | ||||
Drying Time | 350/- | 1 week | All working days | 07 days (for all tests) | |
Adhesion | 350/- | 1 week | All working days | ||
Finish & Flexibility | 200/- | 1 week | All working days | ||
Volatile Matter % | 700/- | 1 week | All working days | ||
Consistency | 350/- | 1 week | All working days | ||
Bend Test | 350/- | 1 week | All working days | ||
Pressure Test | 350/- | 1 week | All working days | ||
Impact resistance Test | 350/- | 1 week | All working days | ||
Scratch Test | 700/- | 1 week | All working days | ||
Flash Point | 350/- | 1 week | All working days | ||
Resistance to Salt Spray | 2900/- | 1 week | All working days | ||
Condensation Test | 350/- | 1 week | All working days | ||
4 | Oils | ||||
Corrosion Test | 350/- | 1 week | All working days | 03 days (for all tests) | |
Water Content | 350/- | 1 week | All working days | ||
Evaporation Test | 350/- | 1 week | All working days | ||
Unsaturation Test | 350/- | 1 week | All working days | ||
Kinematic Viscosity | 350/- | 1 week | All working days | ||
Flash Point | 350/- | 1 week | All working days | ||
Density | 200/- | 1 week | All working days | ||
Boiling Point | 350/- | 1 week | All working days | ||
Ash % | 350/- | 1 week | All working days | ||
Smoke Point | 200/- | 1 week | All working days | ||
Fractional Distillation | 350/- | 1 week | All working days | ||
5 | Greases | ||||
Corrosion Test | 650/- | 1 week | All working days | 03 days (for all tests) | |
Water Content | 350/- | 1 week | All working days | ||
Evaporation Test | 350/- | 1 week | All working days | ||
Unsaturation Test | 350/- | 1 week | All working days | ||
Cone Penetration Test | 350/- | 1 week | All working days | ||
Drop Point | 325/- | 1 week | All working days | ||
Colloidal Stability | 350/- | 1 week | All working days | ||
Mechanical Impurities Test | 350/- | 1 week | All working days | ||
6 | Low Explosives | ||||
Gun Powder - Moisture content | 1000/- | 1 week | All working days | 07 days | |
Propellants | |||||
Heat Test | 350/- | 1 week | All working days | 07 days (for all tests) | |
% Volatile Matter | 1225/- | 1 week | All working days | ||
Methyl Violet Test | 2000/- | 1 week | All working days | ||
Bergman & Jung Test | 2625/- | 1 week | All working days | ||
Dutch Stability Test | 2500/- | 1 week | All working days | ||
Hanzens Test | 2000/- | 1 week | All working days | ||
7 | High Explosives | ||||
Vacuum Stability test of |
8000/- |
1 week | All working days | 03 days (for all tests) | |
Melting Point | 200/- | 1 week | All working days | ||
Setting Point of TNT | 1000/- | 1 week | All working days | ||
Acidity | 700/- | 1 week | All working days | ||
Thermo Gravimetric Analysis | 3000/- | 1 week | All working days | ||
Modulated Differential Scanning Calorimetry (MDSC) |
3000/- | 1 week | All working days | ||
Thermal Activity Monitor | 3000/- | 1 week | All working days | ||
HPLC | 3000/- | 1 week | All working days | ||
8 | Calibration of Equipment | ||||
(a) Voltmeter DC – 3.3 mV– 1000V AC – 30 mV – 700V |
2000/- each | 1 week | All working days | 4 days | |
(b) Ammeter DC - 100µA – 20A AC – 19 mA – 10A |
2000/- each | 1 week | All working days | 4 days | |
(c) Ohmmeter 3Ω - 100MΩ | 3000/- each | 1 week | All working days | 4 days | |
(d) Frequency Meter – 100 Hz – 100 KHz |
3000/- each | 1 week | All working days | 5 days | |
(e) Digital Multimeter – 3 ½ Digit |
10000/- each | 1 week | All working days | 7 days | |
(f) Digital Multimeter – 4 ½ Digit |
10000/- each | 1 week | All working days | 7 days | |
(g) Digital Multimeter – 5 ½ Digit |
12000/- each | 1 week | All working days | 7 days | |
(h) Digital Multimeter – 6 ½ Digit |
13000/- each | 1 week | All working days | 7 days | |
(j) Decayed Resistance Box | 12000/- each | 1 week | All working days | 7 days | |
9 | Co-ordinate measuring using 3D CMM | 2000/- to 10000/- depending on Sample Dimension and Complexity |
1 week | All working days | 7 days |
10 | Dimensional measurement using Profile Projector |
1000/- each | 1 week | All working days | 3 days |
11 | Corrosion testing using Salt Spray Method |
1000/- each | 1 week | All working days | 3 days |
12 | Spring Testing using load cells ranging from 1 kg – 50 kg |
2000/- each | 1 week | All working days | 1 days |
13 | Hardness Testing of metallic samples | 2000/- each | 1 week | All working days | 1 days |
(D) Controllerate of Naval Armament Inspection (West), Mumbai
Contact Details:-
Nodal Contact Officer : Officer-in-Charge (Lab)
(Including obtaining details of mode of payment)
Address : Naval Armament Inspectorate
Naval Station Karanja
Karanja
Maharashtra 400704
Tele No : 022-27233587 / 27233586
E Mail : wncnaikaranja@navy.gov.in
Ser | Test Facility | Appx Cost per Test (Rs) | Advance Notice | Period of Test Facility Available/ Year | Duration of each Test |
---|---|---|---|---|---|
1 | Explosive Test Facility | ||||
(a) Propellant |
|||||
Identification of Propellant | 350/- | One Week | All weekdays (Mar – Dec) |
07 days (for all tests) |
|
Heat test | 350/- | One Week | |||
Methyl Violet test | 2000/- | One Week | |||
Bergmann & Junk Tes | 2625/- | One Week | |||
% Composition of Composite Propellant | 2500/- | One Week | |||
% Volatile Matter | 1225/- | One Week | |||
(b) High Explosive | |||||
Composition Analysis and Identification | 2500/- | One Week | All weekdays (Mar – Dec) |
3 days (for all tests) |
|
Vacuum Stability Test |
8000/-
|
One Week | All weekdays (Mar – Dec) |
||
Melting Point °C | 200/- | One Week | All weekdays (Mar – Dec) |
||
Setting Point of TNT | 1000/- | One Week | All weekdays (Mar – Dec) |
||
Acidity % as HNO3 and H2SO4 | 700/- | One Week | All weekdays (Mar – Dec) |
||
(c) Pyrotechnic | |||||
Chemical Analysis and % Composition | 2500/- | One Week | All weekdays (Mar – Dec) |
3 days (for all tests) |
|
Moisture Content of Gun Powder | 1000/- | One Week | All weekdays (Mar – Dec) |
||
2 | Missile Fuel Testing. | ||||
(a) ‘O’ Fuel (Oxidizer) Testing |
|||||
Density at 20°C | 325/- | One Week | All weekdays (Mar – Dec) |
02 days (for all tests) |
|
% Mechanical Impurities | 325/- | One Week | |||
% Water Content | 325/- | One Week | |||
% N2O4 | 850/- | One Week | |||
HF Content | 850/- | One Week | |||
Phosphoric Acid % | 850/- | One Week | |||
(b) ‘G’ Fuel Testing | |||||
Density at 20°C | 250/- | One Week | All weekdays (Mar – Dec) |
2 days (for all tests) |
|
Water Content % | 400/- | One Week | |||
% of Isomeric Xylidine | 700/- | One Week | |||
% of Triethyl Amine (TEA) | 700/- | One Week | |||
(c) T1 & T6 Fuel Testing | |||||
Density at 20°C | 355/- | One Week | All weekdays (Mar – Dec) |
2 days (for all tests) |
|
Fractional Distillation | 400/- | One Week | |||
Kinematic Viscosity at 20°C | 400/- | One Week | |||
Acidity | 400/- | One Week | |||
Water Content | 700/- | One Week | |||
Flash Point | 400/- | One Week | |||
Copper Strip Corrosion Test | 1000/- | One Week | All weekdays (Mar – Dec) |
||
% Mechanical Impurities | 125/- | One Week | |||
3 | Rubber Test Facility | ||||
Material Identification | 200/- | One Week | All weekdays (Mar – Dec) |
10 days (for all tests) |
|
Hardness of Rubber (Shore-A and Shore D) | 350/- | One Week | |||
Tensile Strength | 1000/- | One Week | |||
% Elongation at break before and after ageing | 700/- | One Week | |||
% Swelling | 2400/- | One Week | |||
% Compression Set | 2400/- | One Week | |||
Adhesion to metal | 2400/- | One Week | |||
Resistance to Hydrocarbon Solvent | 350/- | One Week | |||
4 | Environmental Test Facility | ||||
Cold Conditioning (0 to -30°C) | 300 Rs/ per hr + 100 Overhead Charges (OC) during normal working hours and 600 Rs/ hr + 100 OC during Overtime hours. | One Week | All weekdays (Mar – Dec) |
Depending on Sample | |
Hot Conditioning (20 to 70°C) | One Week | ||||
Tropical Exposure (50 to 95% RH) | One Week | ||||
Intensified Standard Alternating Trial – A (ISAT) | 90000/- | One Week | All weekdays (Mar – Dec) |
168 hrs (1 cycle) |
|
5 | Rocket Motor Static Firing Facility (RMSFF) | ||||
(a) | Functional test of initiators | Rs 3,275/- for first firing in a day | One Week | All working days except Jan to Mar | 02 Hrs for first firing of the day |
Rs 970/- for all subsequent firing in the same day | 0.5 Hr for all subsequent firing in the same day | ||||
(b) | Closed Vessel Test (CVT) | Rs 3,300/- for first firing in a day | 02 Hrs for first firing of the day | ||
Rs 970/- for all subsequent firing in the same day | 0.5 Hr for all subsequent firing in the same day | ||||
(c) | Medium scale Vented Vessel Test (VVT) | Rs 3,795/- for first firing in a day | 02 Hrs for first firing of the day | ||
Rs 1,230/- for all subsequent firing in the same day | 01 Hr for all subsequent firing in the same day | ||||
(d) | Large scale Vented Vessel Test (VVT) | Rs 6,090/- for first firing in a day | 02 Weeks | 03 Hrs for first firing of the day | |
Rs 2,395/- for all subsequent firing in the same day | 01 Hr for all subsequent firing in the same day | ||||
(e) | Store generating Thrust< 10 Tons | Rs 6,935/- for first firing in a day | 04 Hrs for first firing of the day | ||
Rs 3,240/- for all subsequent firing in the same day | 02 Hr for all subsequent firing in the same day | ||||
(f) | Store generating Thrust 10 to 20 Tons | Rs 10,685/- | 03 weeks | All working days except Jan to May | 06 Hrs |
(g) | Store generating Thrust between 20 to 40 Tons | Rs 24,335/- | 04 weeks | 12 Hrs | |
(h) | Store generating Thrust between 20 to 40 Tons using TEM | Rs 16,24,335/- | 12 Hrs | ||
6 | Radiography Facility | ||||
X Ray Radiography | Rs 1820/- for first shot | All working days |
01 Mar to 31 Dec |
03 days (for all tests) | |
Rs 680/- for subsequent shots | |||||
7 | Non Explosive Test Facility. | ||||
(a) Grease | |||||
Consistency by Cone Penitrometer | 325/- | One Week | All weekdays (Mar – Dec) |
03 days (for all tests) | |
Drop Point Temperature | 325/- | One Week | |||
Free Acidity/ Alkalinity | 350/- | One Week | |||
% Water Content | 350/- | One Week | |||
Collidal Stability | 350/- | One Week | |||
Mechanical Impurities | 350/- | One Week | |||
Corrosion on steel plate | 650/- | One Week | |||
% Ash | 350/- | One Week | |||
(b) Oil | |||||
Density at 20°C | 200/- | One Week | All weekdays (Mar – Dec) |
03 days (for all tests) | |
Flash Point | 350/- | One Week | |||
% Water Content | 350/- | One Week | |||
Copper Strip Corrosion | 350/- | One Week | |||
Residue on Evaporation | 350/- | One Week | |||
Kinematic Viscosity at 20°C | 350/- | One Week | |||
Total Acid Number | 350/- | One Week | |||
% Ash Content | 350/- | One Week | |||
Smoke Point | 200/- | One Week | |||
Mechanical Impurities | 200/- | One Week | |||
Cloud and Pour Point | 1000/- | One Week | |||
(c) APC’s Paints & Varnishes | |||||
Drying Time : | All weekdays (Mar – Dec) |
03 days (for all tests) | |||
(a) Surface Dry | 350/- | One Week | |||
(b) Hard Dry | 1050/- | One Week | |||
Consistency by Ford Cup | 350/- | One Week | |||
Finish & Color | 200/- | One Week | |||
Scratch Hardness | 700/- | One Week | |||
Flexibility and Adhesion | 700/- | One Week | |||
% Ash Content | 700/- | One Week | |||
% Water Content | 700/- | One Week | |||
% VM by Mass | 700/- | One Week | |||
Total Solid % by Mass | 700/- | One Week | |||
Ash on Incineration % by Mass | 700/- | One Week | |||
Softening Point | 350/- | One Week | |||
Drop Point | 350/- | One Week | |||
Flash Point | 350/- | One Week | |||
Iodine Value | 350/- | One Week | |||
Resistance to Organic Solvent | 5300/- | One Week | |||
Resistance to Alkali | 2900/- | One Week | |||
Behavior on heating : | |||||
(a) Height of button | 1000/- | One Week | |||
(b) Flow Test | 1000/- | One Week | |||
Appeherant Density | 200/- | One Week | |||
Shellac % by mass | 350/- | One Week | |||
Soluble Lead Compound | 700/- | One Week | |||
Weight in kg/10 Lit | 200/- | One Week | |||
Color | 200/- | One Week | |||
Pressure Test | 200/- | One Week | |||
Protection against Corrosion by Condensation | 1500/- | One Week | |||
Gloss Value | 200/- | One Week | |||
Residue on Evaporation | 700/- | One Week | |||
8 | Calibration Lab. | ||||
Digital Multi Meter | 14800/- | 02 Weeks | All working days | 04 | |
Universal Counter | 18500/- | 02 Weeks | All working days | 05 | |
Oscilloscope | 25800/- | 02 Weeks | All working days | 07 | |
Panel DC Voltmeter | 2000/- | 02 Weeks | All working days | 01 | |
Panel AC Voltmeter | 2000/- | 02 Weeks | All working days | 01 | |
Panel DC Ammeter | 2000/- | 02 Weeks | All working days | 01 | |
Panel AC Ammeter meter | 2000/- | 02 Weeks | All working days | 01 | |
Pressure Gauge | 3700/- | 02 Weeks | All working days | 01 | |
Vacuum Gauge | 3700/- | 02 Weeks | All working days | 01 | |
Tachometer | 7500/- | 02 Weeks | All working days | 02 |
(E) Controllerate of Naval Armament Inspection (South), Alwaye
Contact Details:-
Nodal Contact Officer : Officer-in-Charge (Lab)
(Including obtaining details of mode of payment)
Address : Controllerate of Naval Armament Inspection (South)
NAD Post
Alwaye 683563
Tele No : 0484-2583354 / 2583478
E Mail : sncnaia-navy@nic.in
Ser | Test Facility and Type of Tests | Approx Cost (INR) (per sample) |
Advance Notice | Period for Availability of Test Facility/ Year | Duration of Test (per sample in days) |
---|---|---|---|---|---|
1 | Mechanical Testing of Metals [Tensile, % Elongation and Hardness Test] | 2000/- | 01 Week | All working days | 03 days (for all tests) |
2 | Rubber Test Facility | ||||
Tensile | 1000/- | 01 Week | All working days | 10 days (for all tests) | |
% Elongation | 700/- | 01 Week | All working days | ||
Hardness Degree(IRHD) | 350/- | 01 Week | All working days | ||
Compression Set | 2400/- | 01 Week | All working days | ||
3 | High Explosives | ||||
Vacuum Stability test of TNT CE RDX PETN |
8000/- 20000/- 12800/- 6000/- |
02 Weeks | All working days | 03 days (for all tests) | |
Acidity test | 700/- | 02 Weeks | All working days | ||
Setting point of TNT | 1000/- | 02 Weeks | All working days | ||
Melting point of CE | 200/- | 02 Weeks | All working days | ||
4 | Propellant Test | ||||
Heat Test | 350/- | 01 Week | All working days | 07 days (for all tests) | |
Colour Test | 350/- | 01 Week | All working days | ||
Methyl Violet Test | 2000/- | 01 Week | All working days | ||
Volatile Matter Test | 1225/- | 01 Week | All working days | ||
5 | Gun powder Moisture test |
1000/- | 01 day | All working days | 02 days (for all tests) |
6 | Paint Test | ||||
Drying time test | 350/- | 02 Weeks | All working days | 07 days (for all tests) | |
Bend test | 350/- | 02 Weeks | All working days | ||
Pressure test | 200/- | 02 Weeks | All working days | ||
Viscosity test | 350/- | 02 Weeks | All working days | ||
Flash point test | 350/- | 02 Weeks | All working days | ||
% of water content | 700/- | 02 Weeks | All working days | ||
7 | Shellac Varnish | ||||
Total Non-Volatile Matter | 700/- | 01 Week | All working days | 07 days (for all tests) | |
Ash % | 700/- | 01 Week | All working days | ||
Smooth & Finish | 200/- | 01 Week | All working days | ||
8 | APC No.5 (RD 1286) (Gelation time) |
Rs 350/- | 01 day | All working days | 01 hour for each sample prepared as per standard. |
9 | Environmental Test Facility [Intensified Standard Alternating Trials(ISAT) only] | Rs 90000/- per cycle. | As per users discretion on No. of cycles. | All working days | 01 week per cycle. |
(F) Naval Armament Inspectorate (Jabalpur)
Contact Details:-
Nodal Contact Officer : Principal Inspector of Naval Armament
(Including obtaining details of mode of payment)
Address : Naval Armament Inspectorate
Ordnance Factory Khamaria
Khamaria
Jabalpur 482005
Tele No : Principal Inspector of naval Armament- 0761-2742747 / 2337381
E Mail : naijabalpur-navy@nic.in
Ser | Test Facility and Type of Tests | Approx Cost (INR) | Advance Notice | Period for Availability of Test Facility/ Year | Duration of Test |
---|---|---|---|---|---|
1 | Proof of 30mm ammunition in Percussion/ Electric Mode | Rs 30,715/- per Lot | 01 month | Twice a week | One day |
2 | Proof of 40/60 ammunition | Rs 14,863/- per Lot | 01 month | Twice a week | One day |
3 | Radiography of High Energy Materials | Rs 6,700/- per Store | 01 month | All working days | 2 to 3 days |
For available Test Facilities at DGQA click here.